The lot was cleared early this morning. Two large dump trucks hauled over 20 loads of the timber and stumps away. The surveyor then staked the lot and the excavator started digging the trenches for the footings. The house is larger than I expected. So much for reading the blueprints!!
The footings will be set-up next week and if the weather holds, some concrete may be poured. We are hopeful that every week goes as smooth as this one.
Wednesday, June 17, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment