The lower level plumbing was completed this week. The concrete subcontractor leveled the lower level with gravel, put the reinforcing steel in place and put down a layer of 6 mil poly. We had a radon mitigation system installed under all of the concrete slabs. It is much cheaper to do it now, than to find out you have a problem and have to rectify at a later date. The kitchen area was also finalized, so if we have good weather on Monday they will start pouring the lower level, then the kitchen area, followed by the garage area. The concrete piers are part of our deck area.